Advertisement

Warframe: Railjack Rising Tide Quest Phase 1 'Fuselage' + Build cost of all phases in description

Warframe: Railjack Rising Tide Quest Phase 1 'Fuselage' + Build cost of all phases in description After researching Cephalon Cy from the dry dock and finish building him from the foundry, the Rising Tide quest will be available upon claiming him. Each phase of the quest is about seeking and salvaging Railjack components then rebuilding it at the dry dock, and each phase is gated by a 12h timer that cannot be rushed and the next phase can only begin once the previous phase was completed. There are 6 phases in total. -- Watch live at

Phase 2 "Propulsion":
Phase 3 "Port Nacelle":

Railjack Build Cost (Each part requires 12h build time):
Fuselage: 1m credits/100 Cubic Diodes/3k plastid/15k Rubedo
Propulsion: 1m credits/60 Carbides/1k Cryotic/30 Orokin Cell/20k Nano Spores
Port Nacelle: 1m credits/60 Carbides/5k Circuits/27k Alloy Plate/200 Control Module
Starboard Nacelle: 1m credits/100 Pustrels/500 Fieldron Samples/50 Morhpics/35 Neurodes
Tail: 1m credits/80 Copernics/10k Ferrite/4.5k Polymer Bundle/15 Argon Crystal
Engine Cowling: 1m credits/40 Copernics/500 Detonite Ampule/10k Ferrite/10k Slavage

Total Railjack Build Cost:
6 Mil Credits
100 Cubics
120 Carbides
100 Pustrels
120 Copernics
3k Plastids
15k Rubedo
30 Neural Sensors
1k Cryotic
30 Orokin Cells
20k Nanospores
5k Circuits
27k Alloy Plate
200 Control Modules
500 Fieldron Samples
50 Morphics
35 Neurodes
20k Ferrite
4500 Polymer
15 Argon Crystals
500 Detonite Ampules
10k Salvage

twitch,games,warframe,dry dock,railjack,cephalon cy,rising tide,quest,fuselage,Cubic Diodes,

Post a Comment

0 Comments